Southport Road SLF Phase I & II
Landfill Status:
Landfill Ownership:
About This Facility
Description
Southport Road SLF Phase I II is a closed public landfill located in Kissimmee, Osceola. It has been in operation since 1986.0. The facility is projected to close in 2004.0. The facility is operated by Osceola County, FL. As of 2001.0, the facility holds approximately 1,029,000 tons of waste in place — approximately 79% of its total permitted capacity. Its total design capacity is 1,300,000 tons. The annual waste acceptance rate is approximately 85,800 tons per year. The site covers approximately 38.8 acres. The facility operates a landfill gas collection system, and has an low potential landfill gas-to-energy project. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy.
Year Opened:
Projected Closure:
Operated By:
Composting:
Facility Specifications
Waste in Place:
Design Capacity:
Annual Acceptance:
Current Area:
Current Depth:
Landfill Gas (LFG) System
LFG Collection System:
Flares in Place:
LFG Generated:
LFG Collected:
Methane Content:
Number of Wells:
Frequently Asked Questions
Southport Road SLF Phase I II is currently closed and is no longer accepting waste. The facility closed in 2004.0. It was operated by Osceola County, FL. For waste disposal alternatives in Kissimmee, Osceola, contact your local solid waste management authority for a list of active facilities near you.
Southport Road SLF Phase I II is operated by Osceola County, FL. It is classified as a public landfill, serving the residents and businesses of Kissimmee, Osceola. For questions about billing, hours, or accepted materials, contact Osceola County, FL directly.
As of 2001.0, Southport Road SLF Phase I II has approximately 1,029,000 tons of waste in place. The total design capacity of the facility is 1,300,000 tons, and it is currently at approximately 79% of its design capacity. The facility accepts approximately 85,800 tons of waste per year. The facility is projected to reach capacity and close around 2004.0.
Southport Road SLF Phase I II currently covers approximately 38.8 acres. The facility opened in 1986.0 and has been in continuous operation since then. The size of a landfill reflects both its operational history and the volume of waste it has processed over its lifetime of service to the surrounding community.
Southport Road SLF Phase I II has an active landfill gas (LFG) collection system in place. The facility generates approximately 1.0 million standard cubic feet per day (mmscfd) of landfill gas. Of that, approximately 0.2 mmscfd is collected by the system. The gas contains approximately 27.5% methane, which can be captured for energy generation. The facility operates 54 gas collection wells. Flares are in place at this facility. LFG collection reduces greenhouse gas emissions and, in some cases, generates renewable energy for the grid.
Southport Road SLF Phase I II participates in the following environmental programs: an LFG energy project with status 'Low Potential' is associated with this site. These initiatives help reduce the environmental footprint of landfill operations by capturing resources, reducing greenhouse gas emissions, and diverting material from direct disposal. Contact the facility or its operator for more details on current environmental compliance status.
To contact Southport Road SLF Phase I II, The directory information shown on this page is sourced from the EPA Greenhouse Gas Reporting Program (GHGRP) and the USDA Agricultural Marketing Service, last verified as of data year 2001.0. Data freshness status: Stale (pre-2018). If you are the facility owner or operator and need to update this listing, use the claim listing option on this page.
Related Listings
Claim
Is this your business?
Claim listing is the best way to manage and protect your business.
Claim Now!Review
Write a ReviewThere are no reviews yet.