Parklands Reclamation Project

Report Abuse
Report Abuse

Landfill Status:

Closed

Landfill Ownership:

Private

Contact & Visit

Phone:

n/a

Website:

n/a

Address:

n/a

Hours:

n/a

About This Facility

Description

Parklands Reclamation Project is a closed private landfill located in Bordentown, Burlington, New Jersey. It has been in operation since 1978. The facility is projected to close in 1989. The facility is operated by Interstate Waste Removal and owned by WM. As of 1989, the facility holds approximately 3,585,110 tons of waste in place — approximately 100% of its total permitted capacity. Its total design capacity is 3,585,114 tons. The annual waste acceptance rate is approximately 298,759 tons per year. The site covers approximately 73 acres. The facility operates a landfill gas collection system, and has an low potential landfill gas-to-energy project. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy.

Year Opened:

1978

Projected Closure:

1989

Operated By:

Interstate Waste Removal

Composting:

No

Facility Specifications

Waste in Place:

3585110 tons

Design Capacity:

3585114 tons

Annual Acceptance:

1989 tons/yr

Current Area:

73 acres

Current Depth:

n/a

Landfill Gas (LFG) System

LFG Collection System:

Yes tons

Flares in Place:

Yes tons

LFG Generated:

n/a

LFG Collected:

0.17 mmscfd

Methane Content:

26.3%

Number of Wells:

32

Frequently Asked Questions

Parklands Reclamation Project is currently closed and is no longer accepting waste. The facility ceased operations around 1989. It was previously managed by Interstate Waste Removal. For active waste disposal options in the area, contact your local county solid waste authority for a current list of open facilities near you.

Claim

Is this your business?

Claim listing is the best way to manage and protect your business.

Claim This Listing

There are no reviews yet.

Leave a Review

Your email address will not be published. Required fields are marked *