Wetzel County Landfill
- Cider Run Rd, New Martinsville, WV 26155, USA
- (304) 455-3800
- https://www.jpmascaro.com/our-facilities/wetzel-county-landfill.aspx
Mesquite Creek LF is an open private landfill located in New Braunfels, Comal, Texas. It has been in operation since 1975. The facility is projected to close in 2032. The facility is operated by WM. You can reach the facility by phone at (830) 625-7894. More information is available at https://www.wm.com/us/en/location/tx/new-braunfels?utm_source=gmb&utm_medium=organic&utm_campaign=S04062. As of 2022, the facility holds approximately 12,830,722 tons of waste in place — approximately 73% of its total permitted capacity. Its total design capacity is 17,669,353 tons. The annual waste acceptance rate is approximately 587,035 tons per year. The site covers approximately 97.5 acres. The facility operates a landfill gas collection system, and has an operational landfill gas-to-energy project. The project uses Reciprocating Engine technology. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy. Operating hours are: Monday: 8:00 AM – 5:00 PM , Tuesday: 8:00 AM – 5:00 PM , Wednesday: 8:00 AM – 5:00 PM , Thursday: 8:00 AM – 5:00 PM , Friday: 8:00 AM – 5:00 PM , Saturday: 8:00 AM – 12:00 PM , Sunday: Closed.
Mesquite Creek LF is currently open and actively accepting waste. It operates as a private landfill serving New Braunfels, Comal, Texas. The facility first opened in 1975 and has been in continuous service since then. It is currently projected to remain in operation until approximately 2032. The facility is managed by WM. We recommend calling ahead to confirm current operating conditions before your visit.
As of 2022, Mesquite Creek LF has approximately 12,830,722 tons of waste in place. The total permitted design capacity of the facility is 17,669,353 tons, meaning the site is currently at approximately 73% of its total design capacity. The facility accepts approximately 587,035 tons of waste per year based on the most recent annual data. At the current rate of fill, the facility is projected to reach capacity and close around 2032.
Mesquite Creek LF has an operational landfill gas-to-energy (LFGTE) project using a Reciprocating Engine system. The facility generates approximately 2.7 million standard cubic feet per day (mmscfd) of landfill gas, of which approximately 2.1 mmscfd is actively collected. The landfill gas contains approximately 49.4% methane content. The gas collection system includes 104 extraction wells. This type of project converts waste-generated methane into usable electricity, reducing greenhouse gas emissions while generating renewable energy for the local grid.
The operating hours for Mesquite Creek LF are as follows: Monday: 8:00 AM – 5:00 PM · Tuesday: 8:00 AM – 5:00 PM · Wednesday: 8:00 AM – 5:00 PM · Thursday: 8:00 AM – 5:00 PM · Friday: 8:00 AM – 5:00 PM · Saturday: 8:00 AM – 12:00 PM · Sunday: Closed. These hours are subject to change on holidays or due to weather conditions. We recommend contacting the facility directly at (830) 625-7894 before your visit to confirm current hours, especially if you are planning to drop off waste outside of typical business hours.
Mesquite Creek LF is located at 1700 Kohlenberg Rd, New Braunfels, TX 78130, USA, 78130. The facility is situated in Comal County, Texas. Use the map on this page or enter the address into Google Maps or Apple Maps for turn-by-turn navigation. Call ahead at (830) 625-7894 for access instructions or gate codes if required.
Mesquite Creek LF currently covers approximately 97.5 acres. The facility opened in 1975 and has been in continuous operation since then. The size of a landfill reflects both its operational history and the volume of waste it has processed over its lifetime of service to the surrounding community.
Mesquite Creek LF has an active landfill gas (LFG) collection system in place. The facility generates approximately 2.7 million standard cubic feet per day (mmscfd) of landfill gas. Of that, approximately 2.1 mmscfd is collected by the system. The gas contains approximately 49.4% methane, which can be captured for energy generation. The facility operates 104 gas collection wells. Flares are in place at this facility. LFG collection reduces greenhouse gas emissions and, in some cases, generates renewable energy for the grid.
Mesquite Creek LF participates in the following environmental programs: leachate recirculation is practiced to accelerate waste decomposition; an LFG energy project with status 'Operational' is associated with this site. These initiatives help reduce the environmental footprint of landfill operations by capturing resources, reducing greenhouse gas emissions, and diverting material from direct disposal. Contact the facility or its operator for more details on current environmental compliance status.
To contact Mesquite Creek LF, call (830) 625-7894. The facility website is https://www.wm.com/us/en/location/tx/new-braunfels?utm_source=gmb&utm_medium=organic&utm_campaign=S04062. The mailing address is 1700 Kohlenberg Rd, New Braunfels, TX 78130, USA. The directory information shown on this page is sourced from the EPA Greenhouse Gas Reporting Program (GHGRP) and the USDA Agricultural Marketing Service, last verified as of data year 2022. Data freshness status: Current. If you are the facility owner or operator and need to update this listing, use the claim listing option on this page.
Claim listing is the best way to manage and protect your business.
Claim Now!There are no reviews yet.