Ann Arbor SLF Phase I & II

0
Popular
Report Abuse
Report Abuse

Landfill Status:

Closed

Landfill Ownership:

Public

Contact & Visit

Phone:

n/a

Website:

n/a

Address:

n/a

Hours:

n/a

About This Facility

Description

Ann Arbor SLF Phase I II is a closed public landfill located in Ann Arbor, Washtenaw. It has been in operation since 1959. The facility is projected to close in 1992. The facility is operated by City of Ann Arbor, MI. As of 1992, the facility holds approximately 3,716,670 tons of waste in place. The annual waste acceptance rate is approximately 34,021 tons per year. The site covers approximately 133.1 acres. The facility operates a landfill gas collection system, and has an operational landfill gas-to-energy project. The project uses Reciprocating Engine technology. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy. Ann Arbor SLF Phase I II also offers composting services.

Year Opened:

1959

Projected Closure:

1992

Operated By:

City of Ann Arbor, MI

Composting:

Yes

Facility Specifications

Waste in Place:

3716670 tons

Design Capacity:

n/a

Annual Acceptance:

1992 tons/yr

Current Area:

133.1 acres

Current Depth:

n/a

Landfill Gas (LFG) System

LFG Collection System:

Yes tons

Flares in Place:

Yes tons

LFG Generated:

0.7 mmscfd

LFG Collected:

0.2 mmscfd

Methane Content:

50%

Number of Wells:

43

Frequently Asked Questions

Ann Arbor SLF Phase I II is currently closed and is no longer accepting waste. The facility closed in 1992. It was operated by City of Ann Arbor, MI. For waste disposal alternatives in Ann Arbor, Washtenaw, contact your local solid waste management authority for a list of active facilities near you.

Claim

Is this your business?

Claim listing is the best way to manage and protect your business.

Claim This Listing

There are no reviews yet.

Leave a Review

Your email address will not be published. Required fields are marked *