Bristol Integrated Solid Waste Management Facility
Landfill Status:
Landfill Ownership:
About This Facility
Description
Bristol Integrated Solid Waste Management Facility is a closed public landfill located in Bristol, Bristol city, Virginia. It has been in operation since 1977. The facility is projected to close in 2022. The facility is operated by City of Bristol, VA. As of 2022, the facility holds approximately 5,197,853 tons of waste in place — approximately 45% of its total permitted capacity. Its total design capacity is 11,603,602 tons. The annual waste acceptance rate is approximately 75,467 tons per year. The site covers approximately 33 acres with a maximum depth of 300 feet. The facility operates a landfill gas collection system, and has an operational landfill gas-to-energy project. The project uses Reciprocating Engine technology. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy. Bristol Integrated Solid Waste Management Facility also offers composting services.
Year Opened:
Projected Closure:
Operated By:
Composting:
Facility Specifications
Waste in Place:
Design Capacity:
Annual Acceptance:
Current Area:
Current Depth:
Landfill Gas (LFG) System
LFG Collection System:
Flares in Place:
LFG Generated:
LFG Collected:
Methane Content:
Number of Wells:
Frequently Asked Questions
Bristol Integrated Solid Waste Management Facility is currently closed and is no longer accepting waste. The facility ceased operations around 2022. It was previously managed by City of Bristol, VA. For active waste disposal options in the area, contact your local county solid waste authority for a current list of open facilities near you.
As of 2022, Bristol Integrated Solid Waste Management Facility has approximately 5,197,853 tons of waste in place. The total permitted design capacity of the facility is 11,603,602 tons, meaning the site is currently at approximately 45% of its total design capacity. The facility accepts approximately 75,467 tons of waste per year based on the most recent annual data. At the current rate of fill, the facility is projected to reach capacity and close around 2022.
Bristol Integrated Solid Waste Management Facility has an operational landfill gas-to-energy (LFGTE) project using a Reciprocating Engine system. The facility generates approximately 5.0 million standard cubic feet per day (mmscfd) of landfill gas, of which approximately 0.9 mmscfd is actively collected. The landfill gas contains approximately 32.9% methane content. The gas collection system includes 75 extraction wells. This type of project converts waste-generated methane into usable electricity, reducing greenhouse gas emissions while generating renewable energy for the local grid.
Bristol Integrated Solid Waste Management Facility currently covers approximately 33 acres with a depth of approximately 300 feet. The facility opened in 1977 and has been in continuous operation since then. The size of a landfill reflects both its operational history and the volume of waste it has processed over its lifetime of service to the surrounding community.
Bristol Integrated Solid Waste Management Facility has an active landfill gas (LFG) collection system in place. The facility generates approximately 5.0 million standard cubic feet per day (mmscfd) of landfill gas. Of that, approximately 0.9 mmscfd is collected by the system. The gas contains approximately 32.9% methane, which can be captured for energy generation. The facility operates 75 gas collection wells. Flares are in place at this facility. LFG collection reduces greenhouse gas emissions and, in some cases, generates renewable energy for the grid.
Bristol Integrated Solid Waste Management Facility participates in the following environmental programs: composting services are available at this facility; an LFG energy project with status 'Operational' is associated with this site. These initiatives help reduce the environmental footprint of landfill operations by capturing resources, reducing greenhouse gas emissions, and diverting material from direct disposal. Contact the facility or its operator for more details on current environmental compliance status.
To contact Bristol Integrated Solid Waste Management Facility, The directory information shown on this page is sourced from the EPA Greenhouse Gas Reporting Program (GHGRP) and the USDA Agricultural Marketing Service, last verified as of data year 2022. Data freshness status: Current. If you are the facility owner or operator and need to update this listing, use the claim listing option on this page.
Related Listings
Claim
Is this your business?
Claim listing is the best way to manage and protect your business.
Claim Now!Review
Write a ReviewThere are no reviews yet.