Lee’s Summit SLF

0
Popular
Report Abuse
Report Abuse

Landfill Status:

Closed

Landfill Ownership:

Public

Contact & Visit

Phone:

n/a

Website:

n/a

Address:

n/a

Hours:

n/a

About This Facility

Description

Lees Summit SLF is a closed public landfill located in Lee”s Summit, Jackson. It has been in operation since 1981. The facility is projected to close in 2019. The facility is operated by City of Lee”s Summit, MO. As of 2019, the facility holds approximately 3,007,138 tons of waste in place — approximately 99% of its total permitted capacity. Its total design capacity is 3,035,604 tons. The annual waste acceptance rate is approximately 29,307 tons per year. The site covers approximately 82 acres. The facility operates a landfill gas collection system, and has an candidate landfill gas-to-energy project. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy.

Year Opened:

1981

Projected Closure:

2019

Operated By:

City of Lee”s Summit, MO

Composting:

No

Facility Specifications

Waste in Place:

3007138 tons

Design Capacity:

3035604 tons

Annual Acceptance:

2019 tons/yr

Current Area:

82 acres

Current Depth:

n/a

Landfill Gas (LFG) System

LFG Collection System:

Yes tons

Flares in Place:

Yes tons

LFG Generated:

1 mmscfd

LFG Collected:

0.73 mmscfd

Methane Content:

48.2%

Number of Wells:

52

Claim

Is this your business?

Claim listing is the best way to manage and protect your business.

Claim This Listing

There are no reviews yet.

Leave a Review

Your email address will not be published. Required fields are marked *