Victorville Sanitary Landfill

Report Abuse
Report Abuse

Landfill Status:

Open

Landfill Ownership:

Public
4.1 (56 Google reviews)

Contact & Visit

Phone:

(909) 386-8701

Website:

n/a

Address:

18600 Stoddard Wells Rd, Victorville, CA 92395, USA

Hours:

Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: 8:00 AM – 5:00 PM | Sunday: Closed

Map

18600 Stoddard Wells Rd, Victorville, CA 92395, USA

About This Facility

Description

Victorville Sanitary Landfill is an open public landfill located in Victorville, San Bernardino, California. It has been in operation since 1975. The facility is projected to close in 2047. The facility is operated by BURRTEC and owned by San Bernardino County, CA. You can reach the facility by phone at (909) 386-8701. As of 2022, the facility holds approximately 13,019,199 tons of waste in place — approximately 23% of its total permitted capacity. Its total design capacity is 56,044,792 tons. The annual waste acceptance rate is approximately 384,158 tons per year. The site covers approximately 82 acres with a maximum depth of 100 feet. The facility operates a landfill gas collection system, and has an candidate landfill gas-to-energy project. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy. Operating hours are: Monday: 8:00 AM – 5:00 PM , Tuesday: 8:00 AM – 5:00 PM , Wednesday: 8:00 AM – 5:00 PM , Thursday: 8:00 AM – 5:00 PM , Friday: 8:00 AM – 5:00 PM , Saturday: 8:00 AM – 5:00 PM , Sunday: Closed. Victorville Sanitary Landfill also offers composting services.

Year Opened:

1975

Projected Closure:

2047

Operated By:

BURRTEC

Composting:

Yes

Facility Specifications

Waste in Place:

13019199 tons

Design Capacity:

56044792 tons

Annual Acceptance:

2022 tons/yr

Current Area:

82 acres

Current Depth:

100 feet

Landfill Gas (LFG) System

LFG Collection System:

Yes tons

Flares in Place:

Yes tons

LFG Generated:

2.32 mmscfd

LFG Collected:

0.24 mmscfd

Methane Content:

32.3%

Number of Wells:

63

Frequently Asked Questions

Victorville Sanitary Landfill is currently open and actively accepting waste. It operates as a public landfill serving Victorville, San Bernardino, California. The facility first opened in 1975 and has been in continuous service since then. It is currently projected to remain in operation until approximately 2047. The facility is managed by BURRTEC. We recommend calling ahead to confirm current operating conditions before your visit.

Claim

Is this your business?

Claim listing is the best way to manage and protect your business.

Claim This Listing

There are no reviews yet.

Leave a Review

Your email address will not be published. Required fields are marked *