Coyote Canyon SLF
Landfill Status:
Landfill Ownership:
About This Facility
Description
Coyote Canyon SLF is a closed public landfill located in Newport Beach, Orange, California. It has been in operation since 1963. The facility is projected to close in 1990. As of 1990, the facility holds approximately 38,999,999 tons of waste in place — approximately 100% of its total permitted capacity. Its total design capacity is 39,000,000 tons. The annual waste acceptance rate is approximately 214,093 tons per year. The site covers approximately 325 acres with a maximum depth of 250 feet. The facility operates a landfill gas collection system, and has an planned landfill gas-to-energy project. The project uses Electricity technology. Capturing landfill gas reduces greenhouse gas emissions and, in many cases, generates clean renewable energy.
Year Opened:
Projected Closure:
Operated By:
Composting:
Facility Specifications
Waste in Place:
Design Capacity:
Annual Acceptance:
Current Area:
Current Depth:
Landfill Gas (LFG) System
LFG Collection System:
Flares in Place:
LFG Generated:
LFG Collected:
Methane Content:
Number of Wells:
Frequently Asked Questions
Coyote Canyon SLF is currently closed and is no longer accepting waste. The facility ceased operations around 1990. For active waste disposal options in the area, contact your local county solid waste authority for a current list of open facilities near you.
As of 1990, Coyote Canyon SLF has approximately 38,999,999 tons of waste in place. The total permitted design capacity of the facility is 39,000,000 tons, meaning the site is currently at approximately 100% of its total design capacity. The facility accepts approximately 214,093 tons of waste per year based on the most recent annual data. At the current rate of fill, the facility is projected to reach capacity and close around 1990.
Coyote Canyon SLF has an LFG energy project with a current status of 'Planned'. The project type is Electricity. Landfill gas recovery projects capture methane that would otherwise be released into the atmosphere, reducing greenhouse gas emissions and in many cases generating electricity or other usable energy.
Coyote Canyon SLF is currently closed and is no longer accepting waste. The facility closed in 1990. For waste disposal alternatives in Newport Beach, Orange, California, contact your local solid waste management authority for a list of active facilities near you.
Coyote Canyon SLF currently covers approximately 325 acres with a depth of approximately 250 feet. The facility opened in 1963 and has been in continuous operation since then. The design specifications call for a total area of 325 acres. The size of a landfill reflects both its operational history and the volume of waste it has processed over its lifetime of service to the surrounding community.
Coyote Canyon SLF participates in the following environmental programs: an LFG energy project with status 'Planned' is associated with this site. These initiatives help reduce the environmental footprint of landfill operations by capturing resources, reducing greenhouse gas emissions, and diverting material from direct disposal. Contact the facility or its operator for more details on current environmental compliance status.
To contact Coyote Canyon SLF, The directory information shown on this page is sourced from the EPA Greenhouse Gas Reporting Program (GHGRP) and the USDA Agricultural Marketing Service, last verified as of data year 1990. Data freshness status: Current. If you are the facility owner or operator and need to update this listing, use the claim listing option on this page.
Related Listings
Claim
Is this your business?
Claim listing is the best way to manage and protect your business.
Claim Now!Review
Write a ReviewThere are no reviews yet.